Quarter report released date: 5 Dec 2016
业务
- involved in water industry and engineering work. Water meter manufacturing. Niche business
- Engineering (water supply, rail transportation and hospital), metering
- Construction contributed 95% of the revenue
- Engineering division contributed 91 % segment profit
- Operation mainly in Malaysia
- rail related contractor (etc:LRt2/LRT3)
* Gkent是个铁路主题股,涉及轻快铁延长工程 (29/6/2017 add in)
Business
- 公司当前出口至43个国家(23/6/2017) enanyang (29/6/2017 add in)
Other players in same industries
- Mitra, Gadang,Kerjaya (mid cap players)
财务
- Revenue 和去年同一时期相比上升了25.95% from RM 96.936m to RM122.092m
- Gross profit increased 92.94% from RM17.083m to RM32.961m.
- Gross profit margin: 27%
- Profit before tax increased 76.88% from RM16.709m to RM29.556m
- Profit before tax margin: 24.2%
- Net profit increased 96.66% from RM12.072m to RM23.742m
- Net profit margin: 19.45%
- Trade receivable 和去年同时期相比increased 54.53% from RM240.870 to RM372.217m
- Cash and bank balance: RM 280.180m (last year corresponding quarter: RM 241.645m)
- Net cash company
- outstanding order book RM5.4b, not include LRT 3
工程
20/12/2016
- 从公共工程局(JKR)的手中,包揽一项价值3亿6490万令吉的合约,负责打造雪州布城第7区(Precinct 7)一家拥有220张床位的Endocrine医院。
- 此合约料耗时36个月,预计将在2020年1月完工
1/11/2016
- Letter of Award RM277,190,000,from Jabatan Kerja Raya Malaysia accepting George Kent’s tender to design and build a 150-bed Hospital in Tanjung Karang, Selangor Darul Ehsan
- This Contract is to commence on 24 November 2016 and to be completed over a period of 48 months ie by 24 November 2020.
7/9/2016
- 獲第2捷運近5億令吉鐵軌工程
股价
-RM3.10 (11/1/2016)
-PE:15
***本人还是新手,记录投资分析的目的是想写下想法,方便我以后看罢了***
References:
http://www.georgekent.net/wp-content/uploads/2016/08/Kenanga-Research-Report-160808.pdf