close

18/1/2017

- Gadang to build RM700m(GDV) residential project within Kwasa Damansara

The development period would be six years for the entire project to be completed. Plot R3-1 is expected to be launched by January 2019

Source: http://www.theedgeproperty.com.my/content/1043936/gadang-build-rm700m-residential-project-within-kwasa-damansara

arrow
arrow
    全站熱搜
    創作者介紹
    創作者 小资女 的頭像
    小资女

    小资女向前冲(大马股市)

    小资女 發表在 痞客邦 留言(0) 人氣()